CEIBA PORTOCEM CAN AND SBM MOORING – BRAZIL
Client
Exmar
Dates
2023
Presentation
- Brazil
- Development of an LNG floating terminal in Portocem
- Distance to shore : 2 km
- Water depth: 16 m
- Project phase: Conceptual
DVO Services
Engineering consultancy
DV Offshore was in charge of the follow-up of the mooring system pre-FEED study including:
- Follow up of the pre-FEED studies carried out respectively by CAN and SBM
- Issue of a summary report comparing the advantage/disadvantage/cost of the two solutions
- Cost estimate for both concepts integrating the installation aspect

