CEIBA Portocem CAN and SBM mooring

Floating units
conceptual | FLNG | floating units | LNG transfert | mooring | SBM | shallow water

 

CEIBA PORTOCEM CAN AND SBM MOORING – BRAZIL

Client

Exmar

Dates

2023

Presentation

  • Brazil
  • Development of an LNG floating terminal in Portocem
  • Distance to shore : 2 km
  • Water depth: 16 m
  • Project phase: Conceptual

DVO Services

Engineering consultancy

DV Offshore was in charge of the follow-up of the mooring system pre-FEED study including:

  • Follow up of the pre-FEED studies carried out respectively by CAN and SBM
  • Issue of a summary report comparing the advantage/disadvantage/cost of the two solutions
  • Cost estimate for both concepts integrating the installation aspect