KAOMBO SUL FPSO

Floating units | Mooring systems
Inspection maintenance and repair operations | Technical assistance

KAOMBO SUL FPSO – MOORING LINE REPAIR

Client

TotalEnergies

Dates

2020 – 2022

Presentation

  • Angola – Block 32
  • Distance to shore: 270km from Luanda
  • Water depth: 1650m – deepwater
  • Internal turret moored with chains and polyester ropes
  • KAOMBO Sul FPSO hook-up in 2019
  • Project phase: FPSO under operation – IMR

DVO Services

DV Offshore supervised detailed design, procurement engineering and offshore works for polyester rope section replacement on one mooring line while FPSO was still operating.