Product Well Jumper installation Engineering
Client
Bourbon Subsea Services for Total Energies
Dates
2025
Presentation
- Congo
- Installation engineering with Bourbon Subsea Services, for the installation of PWJ for TotalEnergies Congo. Including Load out, lifting analysis, rigging and procedures.
- Quantity: 5
- Distance to shore : 75 km
- Water depth: 700 m
- Project phase: EXE
DVO Services
Engineering consultancy
DV Offshore was in charge of:
- Pre metrology issue and Post metrology update of following studies.
- Dynamic lifting analysis review
- Listing analysis review
- Rigging design and drawing
- Mobilisation and installation Procedure