BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

  BASIC DESIGN FOR CBM AND SPM NEW TERMINALS Client Société Ivoirienne de Raffinage Dates 2023 Presentation Ivory Coast SIR plans the relocation both currently operated terminals. CBM: 1.6 km from the coast SPM: 6.1 km from the coast Water depth: 25 and 60m...
Sea Water Air Conditioning

Sea Water Air Conditioning

  SEE WATER AIR CONDITIONING Client Creocean Dates 2017 Presentation French Polynesia, Pirae Length: 3,5 km Water depth: from shore to 900m Project phases: feasibility, basic and FEED DVO Services DV Offshore provided: Design of the offshore pipeline Installation...
Terminal CBM SIR1 and terminal SPM SIR 2

Terminal CBM SIR1 and terminal SPM SIR 2

  TERMINAL CBM SIR1 & TERMINAL SPM SIR2 Client Société Ivoirienne de Raffinage Dates Yearly and ponctual interventions since the 1990s Presentation Ivory Coast, offshore Abidjan Distance to shore: 3,5 km Water depth: from shore to 50m Project phases:...
LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

  LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION Client TRASOMAR Monaco Dates 2022 Presentation Principality of Monaco Extension of the water intake pipeline to 80 m water depth to increase cooling capacity of Larvotto thermal loop 1500m approx. 1.6m diameter...
PORT LA NOUVELLE HARBOUR – FOWT

PORT LA NOUVELLE HARBOUR – FOWT

PORT LA NOUVELLE HARBOUR – FOWT wet storage in harbour Client  SEMOP Port La Nouvelle Harbour Dates  2022 Presentation South of France Port la Nouvelle harbour has been selected to be a hub for FOWT projects. Port La Nouvelle harbour plans extension works to...