Sea Water Air Conditioning

Sea Water Air Conditioning

  SEE WATER AIR CONDITIONING Client Creocean Dates 2017 Presentation French Polynesia, Pirae Length: 3,5 km Water depth: from shore to 900m Project phases: feasibility, basic and FEED DVO Services DV Offshore provided: Design of the offshore pipeline Installation...
Terminal CBM SIR1 and terminal SPM SIR 2

Terminal CBM SIR1 and terminal SPM SIR 2

  TERMINAL CBM SIR1 & TERMINAL SPM SIR2 Client Société Ivoirienne de Raffinage Dates Yearly and ponctual interventions since the 1990s Presentation Ivory Coast, offshore Abidjan Distance to shore: 3,5 km Water depth: from shore to 50m Project phases:...
LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

  LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION Client TRASOMAR Monaco Dates 2022 Presentation Principality of Monaco Extension of the water intake pipeline to 80 m water depth to increase cooling capacity of Larvotto thermal loop 1500m approx. 1.6m diameter...
PORT LA NOUVELLE HARBOUR – FOWT

PORT LA NOUVELLE HARBOUR – FOWT

PORT LA NOUVELLE HARBOUR – FOWT wet storage in harbour Client  SEMOP Port La Nouvelle Harbour Dates  2022 Presentation South of France Port la Nouvelle harbour has been selected to be a hub for FOWT projects. Port La Nouvelle harbour plans extension works to...
TANGO FLNG & FSU – ENI Congo

TANGO FLNG & FSU – ENI Congo

TANGO FLNG and FSU – ENI Congo Client EXMAR Dates 2022 Presentation  Republic of Congo Tango FLNG treatment capacity of approximately 3 million standard cubic meters/day LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic...