South Mahakam and Ruby

South Mahakam and Ruby

  SOUTH MAHAKAM AND RUBY – INDONESIA Client Geocean, Nisconi and Total Dates 2011-2012 Presentation Indonesia, Mahakam area, Borneo, Senipah Pipeline installation engineering, installation assistance 2 pipelines, each 10 km long and 24’’ and 14’’ diameters...
Assistance to submarine PEHD installation

Assistance to submarine PEHD installation

  ASSISTANCE TO SUBMARINE PEHD PIPELINE INSTALLATION – GLC FRENCH POLYNESIA Client GL Constructions Dates 2024 Presentation French Polynesia The project is located in Faratea, Tahiti Island, French Polynesia. Two pipelines provide aspiration of seawater in...
BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

  BASIC DESIGN FOR CBM AND SPM NEW TERMINALS Client Société Ivoirienne de Raffinage Dates 2023 Presentation Ivory Coast SIR plans the relocation both currently operated terminals. CBM: 1.6 km from the coast SPM: 6.1 km from the coast Water depth: 25 and 60m...