ASSISTANCE TO SUBMARINE PEHD PIPELINE INSTALLATION – GLC FRENCH POLYNESIA
Client
GL Constructions
Dates
2024
Presentation
- French Polynesia
- The project is located in Faratea, Tahiti Island, French Polynesia. Two pipelines provide aspiration of seawater in the lagoon to supply fish farm equipment. The seawater is then rejected in the sea through 2 other pipelines.
- Length: between 266m and 688m long
- Water depth: between coastline and 35m water depth
- Project phase: Installation
DVO Services
Engineering consultancy:
- Assistance to the final design of the 4 submarine pipelines
- Towing calculations with Orcaflex (software)
- Pipeline laying calculations with Orcaflex