BASIC DESIGN FOR CBM AND SPM NEW TERMINALS
Client
Société Ivoirienne de Raffinage
Dates
2023
Presentation
- Ivory Coast
- SIR plans the relocation both currently operated terminals.
- CBM: 1.6 km from the coast
- SPM: 6.1 km from the coast
- Water depth: 25 and 60m
- Project phase: Preliminary feed
DVO Services
Engineering consultancy:
- Mooring calculations for SPM terminal
- Design of three offshore pipelines
- Shore crossings by directional drilling
- Channel crossing by directional drilling