CLOV Phase 3
Client
TEPA
Dates
2022-2025
Presentation
- Angola
- The objective of CLOV Phase 3 development is to bring incremental resources to CLOV oil production by drilling and connecting to existing subsea facilities 5 step-out production wells.
- These wells are spread in each development area on CLOV (LIRIO, CRAVO & Orquidea-Violeta) and are distant of 3.7 to 4.4 km from existing CLOV subsea production systems.
- The selected concept consists of one single line (CRA) connected to manifold for Lirio wells, and two production loops extension for Cravo & OVC wells.
- Water depth : 1400m
- Project phase: EPCI
DVO Services
Engineering consultancy
DV Offshore was in charge of Flowline and structure Lead including :
- Follow-up of Engineering
- Suppliers’ follow-up
- Follow-up of Construction
- Management of Site Team in Lobito