SOUTH MAHAKAM AND RUBY – INDONESIA
Client
Geocean, Nisconi and Total
Dates
2011-2012
Presentation
- Indonesia, Mahakam area, Borneo, Senipah
- Pipeline installation engineering, installation assistance
- 2 pipelines, each 10 km long and 24’’ and 14’’ diameters
- Water depth: between coastline and 20m water depth
- Project phase: Installation
DVO Services
Engineering manager:
- Subcontractor of offshore pipeline laying contractor
- Installation engineering (mooring calculations, stress calculations, installation procedures)
- Assistance to barge preparation
- Coordination of onshore and offshore teams
- Interface with onshore contractor
- Field engineer