Toscana FSRU exceptional turret maintenance

Toscana FSRU exceptional turret maintenance

  TOSCANA FSRU EXCEPTIONAL TURRET MAINTENANCE Client ECOS Dates 2024 Presentation Italy Exceptional Maintenance of FSRU Turret main bearing. FSRU disconnection, towing to Genoa and Marseille dry dock, repair, towing back to the operation site and reconnection....
CEIBA Portocem CAN and SBM mooring

CEIBA Portocem CAN and SBM mooring

  CEIBA PORTOCEM CAN AND SBM MOORING – BRAZIL Client Exmar Dates 2023 Presentation Brazil Development of an LNG floating terminal in Portocem Distance to shore : 2 km Water depth: 16 m Project phase: Conceptual DVO Services Engineering consultancy DV...
TANGO FLNG & FSU – ENI Congo

TANGO FLNG & FSU – ENI Congo

TANGO FLNG and FSU – ENI Congo Client EXMAR Dates 2022 Presentation  Republic of Congo Tango FLNG treatment capacity of approximately 3 million standard cubic meters/day LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic...
KAOMBO SUL FPSO

KAOMBO SUL FPSO

KAOMBO SUL FPSO – MOORING LINE REPAIR Client TotalEnergies Dates 2020 – 2022 Presentation Angola – Block 32 Distance to shore: 270km from Luanda Water depth: 1650m – deepwater Internal turret moored with chains and polyester ropes KAOMBO Sul FPSO hook-up...
NKS2 FGSO

NKS2 FGSO

NKS2 FGSO – Demobilization and decommissioning study Client  EXMAR Dates  2019 Presentation Republic of Congo – NKS2 field Water depth: 135m Year of conversion: 1996 Turret single point mooring DVO Services DV Offshore was in charge of a preliminary decommissioning...