TANGO FLNG & FSU – ENI Congo

TANGO FLNG & FSU – ENI Congo

TANGO FLNG and FSU – ENI Congo Client EXMAR Dates 2022 Presentation  Republic of Congo Tango FLNG treatment capacity of approximately 3 million standard cubic meters/day LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic...
KAOMBO SUL FPSO

KAOMBO SUL FPSO

KAOMBO SUL FPSO – MOORING LINE REPAIR Client TotalEnergies Dates 2020 – 2022 Presentation Angola – Block 32 Distance to shore: 270km from Luanda Water depth: 1650m – deepwater Internal turret moored with chains and polyester ropes KAOMBO Sul FPSO hook-up...
NKS2 FGSO

NKS2 FGSO

NKS2 FGSO – Demobilization and decommissioning study Client  EXMAR Dates  2019 Presentation Republic of Congo – NKS2 field Water depth: 135m Year of conversion: 1996 Turret single point mooring DVO Services DV Offshore was in charge of a preliminary decommissioning...
KAOMBO NORTE & SUL FPSOs

KAOMBO NORTE & SUL FPSOs

KAOMBO NORTE & SUL FPSOs – MOORING ENGINEER & MARINE OPERATIONS LEAD Client TotalEnergies Dates 2014 – 2019 Presentation Angola – Block 32 Distance to shore: 270km from Luanda Water depth: 1650m – deepwater Internal turret moored FPSOs with chains...
MOHO NORD TLP

MOHO NORD TLP

MOHO Nord TLP Client TOTAL Dates 2013-2015 Presentation Republic of the Congo (Congo-Brazzaville) 80 km offshore Distance from Moho-Bilondo FPU: 20-30 km Distance from Nkossa field: 25 km Water Depth from 750 to 1200 m (TLP: 780 m) DVO Services In charge of the...