BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

BASIC DESIGN FOR CBM AND SPM NEW TERMINALS

  BASIC DESIGN FOR CBM AND SPM NEW TERMINALS Client Société Ivoirienne de Raffinage Dates 2023 Presentation Ivory Coast SIR plans the relocation both currently operated terminals. CBM: 1.6 km from the coast SPM: 6.1 km from the coast Water depth: 25 and 60m...
Sea Water Air Conditioning

Sea Water Air Conditioning

  SEE WATER AIR CONDITIONING Client Creocean Dates 2017 Presentation French Polynesia, Pirae Length: 3,5 km Water depth: from shore to 900m Project phases: feasibility, basic and FEED DVO Services DV Offshore provided: Design of the offshore pipeline Installation...
LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION

  LARVOTTO THALASSO-THERMAL LOOP PIPELINE EXTENSION Client TRASOMAR Monaco Dates 2022 Presentation Principality of Monaco Extension of the water intake pipeline to 80 m water depth to increase cooling capacity of Larvotto thermal loop 1500m approx. 1.6m diameter...